Construction Waste
The GMV team has worked closely with the London Borough of Greenwich to develop a domestic waste reduction strategy for the development. Construction waste was reduced by around 59% by measuring and reporting the waste produced, then segregating and recovering waste that can be recycled as well as through prefabrication.
Download a Fact Sheet here.