|
Construction Waste
The GMV team has worked closely with the London Borough of Greenwich to
develop a domestic waste reduction strategy for the development. Construction
waste was reduced by around 59% by measuring and reporting the waste produced,
then segregating and recovering waste that can be recycled as well as through
prefabrication.
Download a Fact Sheet here.
|